Bangkok Bank Headquarters

Location : Bangkok

Project Reference : Installing SOFTLINK PE Foam

                    Bangkok Bank first installed SOFTLINK PE Foam insulation in 1991 and performed a renovation to replace it in 2022. Notably, the original SOFTLINK insulation remained in excellent condition with no signs of condensation.